Production Projects

Falasca Mechanical will provide a complement of services catered to each individual project.

Education

Stockton (Dorms and Academic)

  •  Client: Jingoli & Son
  •  Architects: 
    • Dorms: Elkus Manfreidi
    • Academic: SOSH
  •  Engineer: Concord
  •  Contract Amount: $16,400,000 (Total)
  •  Project Square Footage: 256,000 (Total)
  •  Project Start: 2016
  •  Dorms: 5 Story Dorm Residence
    • New Construction
    • Features: 32 Outdoor VRF Units, 200+ Indoor VRF Units; Rooftop Heating and Cooling Units; PEX Domestic Water Tubing to Each Dorm Room
  •  Academic: 3 Story Academic Building
    • New Construction
    • Features: VAV Gas Fired Rooftop Units w/ VAV Hot Water Reheat Boxes; Boilers Provide Reheat Water

Rowan Holly Point Dorms

  • Client: Torcon
  •  Architect: Erdy McHenry
  •  Engineer: Concord
  •  Contract Amount: $15,200,000
  •  Project Square Footage: 300,000
  •  Project Start: 2015
  •  7 Story Dorm Residence

USciences

  •  Client: Clemens Construction
  •  Architect: Design Collective Inc.
  •  Engineer: BALA
  •  Contract Amount: $4,550,000
  •  Project Square Footage: 128,500
  •  Project Start: 2017
  •  6 Story Dorm Residence w/ Lower Level Classrooms and Retail Space
    • New Construction
    • Features: Ricweld Piping from Adjacent Building (Tied into Central Plant); Steam, Hot Water, and Chilled Mains (All Welded); 218 Vertical Fan Coils, 42 Horizontal Fan Coils, 3 ERVs, 1 Rooftop Unit

Rowan Veterinarian School

  • Client: LF Driscoll
  • Engineer: Affiliated
  • Architect: Erdy McHenry
  • Contract Amount: $29M
  • Project Completed: August 2025
    • New Veterinarian School for Rowan University and Virtua Health
Multi-Family Housing

1401 Arch

  •  Client: Clemens Construction
  •  Architect: BLTa
  •  Engineer: Concord / Falasca Design Build
  •  Contract Amount: $7,800,000
  •  Project Square Footage: 205,000
  •  Project Start: 2019
  •  15 Story Apartment Building
    • Conversion Project (Office to Apartment)
    • Features: 323 VRF Apartments, 33 Water Source VRF Condensing Units, 2 Boilers, 2 Cooling Towers, 1 Heat Exchanger, 7 Heat Pumps

1515 Chestnut

  •  Client: Clemens Construction
  •  Architect: Harman Deutsch Architecture / Floss Barber Design
  •  Engineer: Mark Ulrick Engineers
  •  Contract Amount: $7,100,000
  •  Project Square Footage: 140,000
  •  Project Start: 2014
  •  17 Story High-Rise Apartment Building
    • Conversion Project (Office to Apartment)
    • Features: Water Source Heat Pump System Supplying 180 New Apartments, Fitness Center, and Retail Space; Located in One of Busiest Corners of Philly

3720 Chestnut

  •  Client: Hunter Roberts Construction
  •  Architect: SITIO / Cope Linder
  •  Engineer: BALA / Falasca Design Assist
  •  Contract Amount: $13,700,000
  •  Project Square Footage: 417,200
  •  Project Start: 2018
  •  30 Story High-Rise Apartment Building
    • New Construction
    • Features: 513 VTAC Units, 66 VRF Air Handlers, 1 Energy Recovery Unit, 5 Single Zone Heat Pumps, 2 Stair Pressurization Systems, 2 Parking Garage Exhaust Systems

1300 Fairmont

  •  Client: Suffolk
  •  Architect: Cope Linder
  •  Engineer: BALA / Falasca Design Assist
  •  Contract Amount: $10,000,000
  •  Project Square Footage: 612,500
  •  Project Start: 2018
  •  15 Story Mid-Rise Apartment Complex
    • New Construction
    • Features: 515 VRF AHU’s, 18 Individual Heat Pumps, 3 Energy Recovery Units, 3 Stair Pressurization Systems
Data Centers

Data One

  • Client: DataOne / Nebius
  • Contract Value: $50M+
  • Designer: BCCLT 
Office Centers

Kirkbride Center

    •  Client: Kirkbride Realty Corp
    •  Architect: N/A
    •  Engineer: Stantec
    •  Contract Amount: $2,979,000
    •  Project Start: 2021
  •  Replacement of existing Steam utility plant with (2) 500 HP High Pressure steam boilers with economizers, new Deaerator and Surge Tanks, Quench Tank and Water Treatment System. Provide new main fuel oil system including (1) 15,000-gallon double wall surface tank, new overflow and day tanks, Auto Fuel port and duplex pumping station. We are also tasked with completely upgrading and repairing the stem and condensate main systems throughout the building. 

SJ Gas HQ

  • Client: Jingoli & Son
  •  Architect: SOSH
  •  Engineer: Concord
  •  Contract Amount: $3,950,000
  •  Project Square Footage: 74,000
  •  Project Start: 2016
  •  6 Story Office Building
    • New Construction
  • Features: Similar to the Academic Building; VAV Gas Fired Rooftop Units w/ VAV Hot Water Reheat Boxes; Boilers Provide Reheat Water
Hotels/Casinos

Revel Casino

Completed 2012 – $93.5M

Harrah’s Expansion and Bay Tower II

Completed 2009 – $47,358,568.00

Borgata Water Club Expansion

Completed 2008 – $36,082,104.00

Chairman Tower

Completed 2010 – $23M

Medical

Virtua Lourdes

Active project – $50M+

Cooper Cancer Institute

Completed 2013 – $7,823,405.00

Atlanticare Meadows

Completed 2024 – $13,756,860.00

Virtua Medical Center Vorhees

Completed 2010 – $45,687,476.00

Jefferson Patient Tower Cherry Hill

Completed 2020 – $14M

Jefferson Washington Township Patient Tower

Completed 2021 – $30M

Century Therapeutics @ 3535 Market

  • Client: Turner Construction
  • Architect: Hargrove
  •  Engineer: Hargrove
  •  Contract Amount: $3,911,000
  •  Project Square Footage: 25,000
  •  Project Start: 2021
  • 16th Floor Conversion to Labs

Cooper Moorestown

Completed 2023 – $13,130,036.00

Cooper New Patient Tower A

Active – $50M+

Inspira Mullica Hill New Patient Tower

  • GC: Torcon & Michael Riesz
  • Engineer: Highland Associates
  • Contract Value: $20M+